British Rail Class 319

Description

In the 1980s there were plans for a rail service that would link Bedford and Brighton. These services would cross London in a north-south direction, and thus became the first route for many years to cross London from north to south. These services were branded Thameslink by Network SouthEast, which operated the services.

Before the Thameslink service became operational in 1988, stations along the Midland Main Line north of London were served by Class 317 electric multiple units, introduced in 1981. This required the electrification (using 25 kV AC overhead wires) of the line between Bedford and London St. Pancras and the branch to Moorgate. This service was therefore known colloquially as the “Bed-Pan” service. Key destinations included Bedford, Luton, St Albans, Moorgate, and London St. Pancras.

As the Thameslink service was to use a route with 25kV AC OHLE north of Farringdon and along the branch to Moorgate, and 750V DC third-rail electrification south of Farringdon, the Class 319 trains were built with dual-voltage capabilities, making them very versatile. Their body shape is slightly different from contemporary electric units due to restrictions in the loading gauge in Kings Cross tunnel, which meant that other dual-voltage units were not suitable. They were also required to have Emergency end doors in the cabs, due to the twin single bore layout of Smithfield tunnel preventing normal train evacuation .

Two sub-classes of Class 319 units were originally built. Over the years, units have been refurbished, creating five sub-classes, of which four still exist.

Class 319/0

The first batch of 60 units, built in 198788, were classified as Class 319/0. Units were numbered in the range 319001060 and had a maximum speed of 100 mph. Each unit consisted of four carriages; two outer driving trailers, an intermediate motor with a roof mounted Stone Faiveley AMBR pantograph & four DC GEC G315BZ traction motors (two per a bogie), and an intermediate trailer housing a compressor, motor alternator and two toilets. Seating was standard class only, in 2+3 layout. The technical description of the unit formation is DTSO(A)+MSO+TSO+DTSO(B). Individual vehicles were numbered as follows:

7729177381 (odd) and 7743177457 (odd) DTSO(A)

6289162936 and 6296162974 MSO

7177271817 and 7186671879 TSO

7729077380 (even) and 7743077456 (even) DTSO(B)

DTSO(B) was configured with a lockable sliding door in the section between the driving cab and the first set of power doors, and the longitudinal bench seats there were hinged to tip up. This was to enable the units to carry parcels if required, but was rarely used. The sliding door is being removed during unit refurbishment, but the tip up seat area has been retained for carrying bicycles and wheelchairs.

Vehicles were numbered in two ranges, corresponding to units 319001046 and 319047060. The gaps in the number series (e.g. 7738277429) were filled by the Class 442 units, which were being built around the same period.

These units were built for long-distance cross-London services between Bedford and Brighton, using the Midland Main Line between Bedford and London, and the Brighton Main Line between London and Brighton. This service crosses London by means of the reopened Snow Hill tunnel between Farringdon and London Blackfriars. When new, the units were painted in Network SouthEast livery. Once the subclass 319/1 batch were built, these trains were then to be found working local inner-suburban services between Luton – St. Albans – London – Sutton/Wimbledon.

When privatisation came, the first 13 units (319001319013) were used for outer-suburban services on Connex South Central (now Southern), some losing their 25kV AC overhead equipment, although it has since has been refitted. 319014319020 were rebuilt into 319214319220; see Class 319/2 below for details.

Thameslink

Those numbered in the 319021-319060 series were retained by Thameslink, who had them refurbished at Railcare Wolverton in 1997-8. The interior refurbishment featured the following:

Installation of blue carpets

Installation of first-class compartment in DTSO (A), the vehicle next to the MSO

Retrimmed seats into the blue/yellow Thameslink moquette – some seats were removed in the centre of each vehicle to give a 2+2 layout

The exteriors were reliveried into the Thameslink navy blue bodyside with yellow and white stripes livery. They were renumbered into the subclass 319/4, in the range of 319421-319460, by adding four hundred to each unit number. The sub-class 319/4 units were then moved on to the Bedford – Luton – St. Albans – London – East Croydon – Gatwick Airport – Brighton service, known as ‘THAMESLINK Cityflier’.

In the period 2003-5, during the Thameslink blockade, some of the sub-class 319/4s were given a minor interior refresh with retrimmed seats in a modified version of the Thameslink moquette. All sub-class 319/4 units received a refurbished First Class compartment, apart from 319444, which retained its original 1997-designed first-class compartment. The first-class compartments were enhanced by the following improvements:

New carpet trim

Chrome-plated heater panels

Retrimmed seats in a new version of Thameslink moquette

Class 319/1

The second batch of 26 units, built in 1990, were classified Class 319/1. Units were numbered in the range 319161186. The formation of the second batch of sets was similar to that of the earlier units, except there was provision for first-class seating in Driving Trailer (A) and the MSO vehicle was fitted with the roof-mounted, more modern Brecknell Willis High Speed pantograph design. Like the first batch, seating was 2+3 layout in standard class, with 2+2 seating in first class. Thus, each unit was formed DTCO+MSO+TSO+DTSO. Individual vehicles were numbered as follows:

7745977497 (odd) and 7797377983 (odd) DTCO

6304363062 and 6309363098 MSO

7192971948 and 71979-71984 TSO

7745877496 (even) and 7797277984 (even) DTSO

Vehicles were numbered in two ranges, corresponding to units 319161180 and 319181186.

Thameslink Class 319/3 ‘City Metro’ unit

The second batch were first used for Bedford – Luton – St. Albans – London – East Croydon – Gatwick Airport – Brighton due to them having first-class accommodation aboard the DTCO vehicle.

Thameslink

In the period 1997-8, Thameslink ordered the sub-class 319/1 units to be converted at Eastleigh for use on Luton – St. Albans – London – Sutton/Wimbledon service, known as ‘THAMESLINK CityMetro’. The conversion involved removing first-class compartments from the DTCO vehicles (thus changing them to DTSO), a relivery into Thameslink navy-blue bodyside with yellow and white stripes livery, and renumbering into the subclass 319/3. In the period 2003-5, during the Thameslink blockade, all of the sub-class 319/3s were given a minor interior refresh with retrimmed seats in a modified version of the Thameslink moquette.

Current operations

Following privatisation of British Rail, the Class 319 fleet was divided between two operators. Thameslink inherited the majority of the fleet, with units 319021060 and 319161186. Connex South Central inherited a small fleet of twenty units, nos. 319001020. Connex was later stripped of its franchise, which was then re-allocated to Govia and subsequently renamed South Central and thereafter Southern, whereas Thameslink (which was itself a Govia franchise until April 2006) has become part of First Capital Connect.

Southern

‘Lounge’ seating in a 319/2 Brighton Express

Seven of the Class 319/0 sets (319014319020) were rebuilt into Class 319/2 units (319214319220) and dedicated to Brighton Express services from London Victoria to Brighton. (Class 377 “Electrostar” units now operate all of these services). These units were rebuilt by Railcare Wolverton to give them low-density interiors, a disabled toilet, and a special ‘lounge’ seating area in the saloon space below the pantograph in the MSO, where a buffet counter was provided.

When Class 377/3 units replaced them on Brighton Express services, the seven Class 319/2 units were allocated to peak-only London-Guildford via West Croydon and London-Horsham via Three Bridges services.

As part of a long-term loan agreement, Southern currently subleases all of its Class 319/0 units to First Capital Connect, as well as the Class 319/2 units which followed when Class 377 trains replaced them. Thus the entire Class 319 fleet is now operating FCC Thameslink services.

First Capital Connect

First Capital Connect took over the Thameslink franchise on 1 April 2006. It gradually applied its livery in the form of vinyl to the exterior of many trains.

On 26 October 2006 the first fully-refreshed train was launched. This was subclass 319/4 unit No. 319425 and was named Transforming Travel on its press launch trip from Bedford to Brighton. During the trip, the refreshed train was displayed to rail user groups as well as the media.

The First Capital Connect subclass 319/4 refresh featured the following interior improvements:

New ‘easy to clean’ flooring

Retrimmed seats into the First Capital Connect moquette

Some seats in standard class were removed and vertical luggage stacks installed in their place; a further two seats were removed in the TSO vehicle to allow easier access to the toilet

Repainted daldo side panels and wall ends

Existing sanchions painted pink

New sanchions leading from some seats to the overhead luggage rack to provide standing passengers with something to hold on to and more support

Improved, brighter fluorescent lighting diffusers

The refresh took place at Railcare Wolverton works and also featured both a mechanical overhaul (under the solebar) and a full exterior relivery, again in vinyl. Some class 319/4 units have had their Stone Faiveley AMBR pantograph replaced by the industry standard Bracknell Willis High Speed pantograph design.

Apart from around 12 subclass 319/4 members, the majority of the subclass have been externally reliveried and internally refreshed. The company is now relivering and refreshing the subclass 319/3 fleet, to the same specification as subclass 319/4; however these units remain Standard Class only, with the 2+3 seating arrangement throughout, and do not feature vertical luggage stacks. There are now sufficient Class 377 Electrostars in service to permit a restart of the programme and Class 319/3 No. 319374 became the 42ND unit to be treated at Railcare Wolverton on 10TH August and on 24TH, 319370 (this is 43RD to be treated, so the halfway point has now been reached) was admitted to the works for refresh.

As mentioned above, First Capital Connect is sub-leasing 8 Class 319/0 units from Southern. As part of the Route Utilisation Strategy for the Brighton Main Line, 48 Class 319 coaches have been transferred to First Capital Connect from Southern.

First Capital Connect have leased all Southern’s Class 319s and have stated it will be a permanent move meaning they will not return to Southern. The remaining 319/0′s will be refreshed during the course of 2010 and 319/2s will receive an exterior relivery and interior refresh, including the replacement of the snug area underneath the pantograph aboard the PMSO vehicle with 16 proper seats from March 2010. The Class 319/2s worked with Thameslink in a short period but were transferred back to Southern following First Capital Connect taking over the Thameslink franchise.

Southeastern

Southeastern jointly operates the 319s with First Capital Connect on its Sevenoaks to Kentish Town / Bedford services. This is because the London Blackfriars terminal platforms have been closed for the Thameslink Programme. Under this arrangement trains are classified as an FCC service whilst north of Blackfriars, and a Southeastern service whilst south of there. The work is split between FCC drivers from Bedford and Blackfriars, and Southeastern drivers from Victoria and Orpington depots. All of those drivers sign the whole route from Sevenoaks to Bedford. Thus with the cascaded stock it is currently possible to find a Southern liveried 319 operating an FCC service whilst being driven by a Southeastern driver!

Future plans

As part of its announcement of the electrification of both the Great Western Main Line and the Liverpool to Manchester (via Newton Le Willows) route, the Government has announced that when new Thameslink rolling stock arrives from 2013-2015, Class 319s will be refurbished, fitted with air-conditioning, and transferred to the following two routes:

to operate all suburban services between Oxford, Newbury, Reading and London

to operate Manchester Airport to Liverpool Lime Street and Manchester Victoria to Liverpool Lime Street services

Notable Units

Units 319008 and 319009 are famous for two reasons:

On 10 December 1993 they travelled through the Channel Tunnel to Calais-Frthun and back with a party of invited guests, after the construction consortium TransManche Link (who were responsible for the construction of the Tunnel) had transferred responsibility for operations and management over to Eurotunnel. Their pantographs were modified at Chart Leacon depot in Ashford beforehand. For the subsequent “Folkestone 1994″ event, which saw the first paying members of the public taken into the tunnel by train, units 319008 and 319009 were named “Cheriton” and “Coquelles” respectively, and plaques adorned with the Union Flag and Tricolor were installed on their motor carriages.

In 1994 they set a record for the shortest London to Brighton journey time, at 37 minutes 54 seconds. This was improved upon in 2005, with the Speed Run event by Southern, using its Class 377 units 377472 and 377474. The new record is 36 minutes 56 seconds.

Both units have been denamed since being transferred from Southern to First Capital Connect.

Gallery

Southern liveried Class 319/0 No. 319011 at London St. Pancras, working a First Capital Connect service, bound for Brighton.

The original mid 80s Network SouthEast interior aboard a Class 319/0.

First Capital Connect refreshed Class 319/0 No. 319003 departs London St. Pancras, with a service bound for Bedford.

The refreshed interior aboard a First Capital Connect Class 319/0.

A refurbished Southern Class 319/2 No. 319217 at London St. Pancras, working a First Capital Connect service, bound for Brighton.

The refurbished First Class cabin aboard a Southern Class 319/2 EMU.

The refurbished Standard Class accommodation aboard a Southern Class 319/2 EMU.

A refurbished Southern Class 319/2 No. 319219 at Bedford, working a First Capital Connect service, bound for Brighton.

First Capital Connect refreshed Class 319/4 EMU No. 319428 at London St. Pancras, with a service bound for Brighton.

The refreshed interior of a First Class cabin aboard a First Capital Connect Class 319/4 EMU.

The refreshed interior of Standard Class accommodation aboard a First Capital Connect Class 319/4 EMU.

First Capital Connect refreshed Class 319/4 EMU No. 319456 at London St. Pancras, with a service bound for Brighton.

One of the pair of hameslink Programme advertising liveried Class 319/3 EMUs, No. 319364 ransforming Blackfriars at St. Albans City, with a service bound for the Streatham – Sutton/Wimbledon loop.

The other Class 319/3 EMU in the hameslink Programme advertising livery is 319365 ransforming Farringdon and is seen at London St. Pancras.

Fleet details

Class

Operator

No. Built

Year Built

Cars per Set

Unit nos.

Notes

Class 319/0

First Capital Connect

13

1987-1988

4

319001 – 319013

Class 319/2

7

319214 – 319220

Rebuilt from Class 319/0 1996-1997

Originally classed as 319/0(319014 – 319020)

Class 319/3

26

1990

319361 – 319386

Rebuilt from Class 319/1 1997-1999

Originally classed as 319/1(319161 – 319186)

Class 319/4

40

1987-1988

319421 – 319460

Rebuilt from Class 319/0

Originally classed as 319/0(319021 – 319060)

References

^ Department for Transport (2007-04-04). “More trains arriving on busy rail routes”. http://www.dft.gov.uk/pgr/rail/passenger/franchises/moretrains. Retrieved 2007-07-14. 

^ “Britain Transport Infrastructure – Rail Electrification” (pdf). DfT. 2009-07-22. pp. 2224. http://www.dft.gov.uk/pgr/rail/pi/rail-electrification.pdf. Retrieved 2009-08-25. 

^ Class 319

^ http://www.southernelectric.org.uk/news/lbig01.html

External links

Wikimedia Commons has media related to: British Rail Class 319

Fleet changes in April 2006

List of Class 319 trains in operation

Technical descriptions of trains used by First Capital Connect

TheRailwayCentre – Class 319.

v  d  e

BREL Mark 3-derived family

Diesel:

Class 150 Class 154 Class 210 450 Class (NIR)

Electric:

Class 317 Class 318 Class 319 Class 320 Class 321 Class 322 Class 455 Class 456

Electric (23 m):

Class 442

v  d  e

British Rail electric multiple units

AC units:

300  302  303  304  305  306  307  308  309  310  311  312  313  314  315  316 (I)  316 (II)  317  318  319  320  321  322  323  325  331  332  333  334  341  342  350  357  360  365  370  371  373  375  376  377  378  379  380  381  390  395

AC units

(pre-TOPS):

AM1  AM2  AM3  AM4  AM5  AM6  AM7  AM8  AM9  AM10  AM11  CP  CW  MR Lancaster Units  SL

DC units:

401  402  403  404  405  410  411  412  413  414  415  416  418  419  420  421  422  423  424  427  430  431  432  438  442  444  445  446  447  450  455  456  457  458  460  465  466  471  480  482 (I)  482 (II)  483  485  486  487  488  489  499  501  502  503  504  505  506  507  508  510

DC units

(Original TOPS):

411  412  413  414  421  422  423  424  431  432  441  442  451  452  453  461  462  491  492

DC units

(pre-TOPS):

BEMU  LNER Tyneside Units  LNWR Watford Units  LYR Bury Units

Southern Railway

designations:

2 Bil  2 EPB  2 Hal  2 Hap  2 Nol  2 Pan  2 Pep  2 Sap  2 SL  2 Wim  3 Cep  3 Cig  3 Cop  3 Sub  3 TC  3 Tis  4 Bep  4 Big  4 Buf  4 Cap  4 Cep  4 Cig  4 Com  4 Cor  4 DD  4 Des  4 EPB  4 Gri  4 Jop  4 Lav  4 Pep  4 Rep  4 Res  4 Sub  4 TC  4 Tep  4 Vec  4 Veg  4 Vep  4 Vip  4 Vop  5 Bel  5 Des  5 TCB  5 Wes  6 Cit  6 Pan  6 Pul  6 Rep  8 Dig  8 Gat  8 Mig  8 Vab  GLV  MLV  TLV

Families:

1959 design  1972 design  Mark 2-derived  Mark 3-derived  A-Train  Desiro  Electrostar  Juniper  Networker

Diesel locomotives  Electric locomotives  Miscellaneous locomotives  Diesel multiple units  Electric multiple units  Departmental multiple units

Categories: British Rail electric multiple units | BREL productsHidden categories: Unusual parameters of Infobox train template

Tags: , , , , , , , , , , , , , , , , , , , , , ,