British Rail Class 319
Description
In the 1980s there were plans for a rail service that would link Bedford and Brighton. These services would cross London in a north-south direction, and thus became the first route for many years to cross London from north to south. These services were branded Thameslink by Network SouthEast, which operated the services.
Before the Thameslink service became operational in 1988, stations along the Midland Main Line north of London were served by Class 317 electric multiple units, introduced in 1981. This required the electrification (using 25 kV AC overhead wires) of the line between Bedford and London St. Pancras and the branch to Moorgate. This service was therefore known colloquially as the “Bed-Pan” service. Key destinations included Bedford, Luton, St Albans, Moorgate, and London St. Pancras.
As the Thameslink service was to use a route with 25kV AC OHLE north of Farringdon and along the branch to Moorgate, and 750V DC third-rail electrification south of Farringdon, the Class 319 trains were built with dual-voltage capabilities, making them very versatile. Their body shape is slightly different from contemporary electric units due to restrictions in the loading gauge in Kings Cross tunnel, which meant that other dual-voltage units were not suitable. They were also required to have Emergency end doors in the cabs, due to the twin single bore layout of Smithfield tunnel preventing normal train evacuation .
Two sub-classes of Class 319 units were originally built. Over the years, units have been refurbished, creating five sub-classes, of which four still exist.
Class 319/0
The first batch of 60 units, built in 198788, were classified as Class 319/0. Units were numbered in the range 319001060 and had a maximum speed of 100 mph. Each unit consisted of four carriages; two outer driving trailers, an intermediate motor with a roof mounted Stone Faiveley AMBR pantograph & four DC GEC G315BZ traction motors (two per a bogie), and an intermediate trailer housing a compressor, motor alternator and two toilets. Seating was standard class only, in 2+3 layout. The technical description of the unit formation is DTSO(A)+MSO+TSO+DTSO(B). Individual vehicles were numbered as follows:
7729177381 (odd) and 7743177457 (odd) DTSO(A)
6289162936 and 6296162974 MSO
7177271817 and 7186671879 TSO
7729077380 (even) and 7743077456 (even) DTSO(B)
DTSO(B) was configured with a lockable sliding door in the section between the driving cab and the first set of power doors, and the longitudinal bench seats there were hinged to tip up. This was to enable the units to carry parcels if required, but was rarely used. The sliding door is being removed during unit refurbishment, but the tip up seat area has been retained for carrying bicycles and wheelchairs.
Vehicles were numbered in two ranges, corresponding to units 319001046 and 319047060. The gaps in the number series (e.g. 7738277429) were filled by the Class 442 units, which were being built around the same period.
These units were built for long-distance cross-London services between Bedford and Brighton, using the Midland Main Line between Bedford and London, and the Brighton Main Line between London and Brighton. This service crosses London by means of the reopened Snow Hill tunnel between Farringdon and London Blackfriars. When new, the units were painted in Network SouthEast livery. Once the subclass 319/1 batch were built, these trains were then to be found working local inner-suburban services between Luton – St. Albans – London – Sutton/Wimbledon.
When privatisation came, the first 13 units (319001319013) were used for outer-suburban services on Connex South Central (now Southern), some losing their 25kV AC overhead equipment, although it has since has been refitted. 319014319020 were rebuilt into 319214319220; see Class 319/2 below for details.
Thameslink
Those numbered in the 319021-319060 series were retained by Thameslink, who had them refurbished at Railcare Wolverton in 1997-8. The interior refurbishment featured the following:
Installation of blue carpets
Installation of first-class compartment in DTSO (A), the vehicle next to the MSO
Retrimmed seats into the blue/yellow Thameslink moquette – some seats were removed in the centre of each vehicle to give a 2+2 layout
The exteriors were reliveried into the Thameslink navy blue bodyside with yellow and white stripes livery. They were renumbered into the subclass 319/4, in the range of 319421-319460, by adding four hundred to each unit number. The sub-class 319/4 units were then moved on to the Bedford – Luton – St. Albans – London – East Croydon – Gatwick Airport – Brighton service, known as ‘THAMESLINK Cityflier’.
In the period 2003-5, during the Thameslink blockade, some of the sub-class 319/4s were given a minor interior refresh with retrimmed seats in a modified version of the Thameslink moquette. All sub-class 319/4 units received a refurbished First Class compartment, apart from 319444, which retained its original 1997-designed first-class compartment. The first-class compartments were enhanced by the following improvements:
New carpet trim
Chrome-plated heater panels
Retrimmed seats in a new version of Thameslink moquette
Class 319/1
The second batch of 26 units, built in 1990, were classified Class 319/1. Units were numbered in the range 319161186. The formation of the second batch of sets was similar to that of the earlier units, except there was provision for first-class seating in Driving Trailer (A) and the MSO vehicle was fitted with the roof-mounted, more modern Brecknell Willis High Speed pantograph design. Like the first batch, seating was 2+3 layout in standard class, with 2+2 seating in first class. Thus, each unit was formed DTCO+MSO+TSO+DTSO. Individual vehicles were numbered as follows:
7745977497 (odd) and 7797377983 (odd) DTCO
6304363062 and 6309363098 MSO
7192971948 and 71979-71984 TSO
7745877496 (even) and 7797277984 (even) DTSO
Vehicles were numbered in two ranges, corresponding to units 319161180 and 319181186.
Thameslink Class 319/3 ‘City Metro’ unit
The second batch were first used for Bedford – Luton – St. Albans – London – East Croydon – Gatwick Airport – Brighton due to them having first-class accommodation aboard the DTCO vehicle.
Thameslink
In the period 1997-8, Thameslink ordered the sub-class 319/1 units to be converted at Eastleigh for use on Luton – St. Albans – London – Sutton/Wimbledon service, known as ‘THAMESLINK CityMetro’. The conversion involved removing first-class compartments from the DTCO vehicles (thus changing them to DTSO), a relivery into Thameslink navy-blue bodyside with yellow and white stripes livery, and renumbering into the subclass 319/3. In the period 2003-5, during the Thameslink blockade, all of the sub-class 319/3s were given a minor interior refresh with retrimmed seats in a modified version of the Thameslink moquette.
Current operations
Following privatisation of British Rail, the Class 319 fleet was divided between two operators. Thameslink inherited the majority of the fleet, with units 319021060 and 319161186. Connex South Central inherited a small fleet of twenty units, nos. 319001020. Connex was later stripped of its franchise, which was then re-allocated to Govia and subsequently renamed South Central and thereafter Southern, whereas Thameslink (which was itself a Govia franchise until April 2006) has become part of First Capital Connect.
Southern
‘Lounge’ seating in a 319/2 Brighton Express
Seven of the Class 319/0 sets (319014319020) were rebuilt into Class 319/2 units (319214319220) and dedicated to Brighton Express services from London Victoria to Brighton. (Class 377 “Electrostar” units now operate all of these services). These units were rebuilt by Railcare Wolverton to give them low-density interiors, a disabled toilet, and a special ‘lounge’ seating area in the saloon space below the pantograph in the MSO, where a buffet counter was provided.
When Class 377/3 units replaced them on Brighton Express services, the seven Class 319/2 units were allocated to peak-only London-Guildford via West Croydon and London-Horsham via Three Bridges services.
As part of a long-term loan agreement, Southern currently subleases all of its Class 319/0 units to First Capital Connect, as well as the Class 319/2 units which followed when Class 377 trains replaced them. Thus the entire Class 319 fleet is now operating FCC Thameslink services.
First Capital Connect
First Capital Connect took over the Thameslink franchise on 1 April 2006. It gradually applied its livery in the form of vinyl to the exterior of many trains.
On 26 October 2006 the first fully-refreshed train was launched. This was subclass 319/4 unit No. 319425 and was named Transforming Travel on its press launch trip from Bedford to Brighton. During the trip, the refreshed train was displayed to rail user groups as well as the media.
The First Capital Connect subclass 319/4 refresh featured the following interior improvements:
New ‘easy to clean’ flooring
Retrimmed seats into the First Capital Connect moquette
Some seats in standard class were removed and vertical luggage stacks installed in their place; a further two seats were removed in the TSO vehicle to allow easier access to the toilet
Repainted daldo side panels and wall ends
Existing sanchions painted pink
New sanchions leading from some seats to the overhead luggage rack to provide standing passengers with something to hold on to and more support
Improved, brighter fluorescent lighting diffusers
The refresh took place at Railcare Wolverton works and also featured both a mechanical overhaul (under the solebar) and a full exterior relivery, again in vinyl. Some class 319/4 units have had their Stone Faiveley AMBR pantograph replaced by the industry standard Bracknell Willis High Speed pantograph design.
Apart from around 12 subclass 319/4 members, the majority of the subclass have been externally reliveried and internally refreshed. The company is now relivering and refreshing the subclass 319/3 fleet, to the same specification as subclass 319/4; however these units remain Standard Class only, with the 2+3 seating arrangement throughout, and do not feature vertical luggage stacks. There are now sufficient Class 377 Electrostars in service to permit a restart of the programme and Class 319/3 No. 319374 became the 42ND unit to be treated at Railcare Wolverton on 10TH August and on 24TH, 319370 (this is 43RD to be treated, so the halfway point has now been reached) was admitted to the works for refresh.
As mentioned above, First Capital Connect is sub-leasing 8 Class 319/0 units from Southern. As part of the Route Utilisation Strategy for the Brighton Main Line, 48 Class 319 coaches have been transferred to First Capital Connect from Southern.
First Capital Connect have leased all Southern’s Class 319s and have stated it will be a permanent move meaning they will not return to Southern. The remaining 319/0′s will be refreshed during the course of 2010 and 319/2s will receive an exterior relivery and interior refresh, including the replacement of the snug area underneath the pantograph aboard the PMSO vehicle with 16 proper seats from March 2010. The Class 319/2s worked with Thameslink in a short period but were transferred back to Southern following First Capital Connect taking over the Thameslink franchise.
Southeastern
Southeastern jointly operates the 319s with First Capital Connect on its Sevenoaks to Kentish Town / Bedford services. This is because the London Blackfriars terminal platforms have been closed for the Thameslink Programme. Under this arrangement trains are classified as an FCC service whilst north of Blackfriars, and a Southeastern service whilst south of there. The work is split between FCC drivers from Bedford and Blackfriars, and Southeastern drivers from Victoria and Orpington depots. All of those drivers sign the whole route from Sevenoaks to Bedford. Thus with the cascaded stock it is currently possible to find a Southern liveried 319 operating an FCC service whilst being driven by a Southeastern driver!
Future plans
As part of its announcement of the electrification of both the Great Western Main Line and the Liverpool to Manchester (via Newton Le Willows) route, the Government has announced that when new Thameslink rolling stock arrives from 2013-2015, Class 319s will be refurbished, fitted with air-conditioning, and transferred to the following two routes:
to operate all suburban services between Oxford, Newbury, Reading and London
to operate Manchester Airport to Liverpool Lime Street and Manchester Victoria to Liverpool Lime Street services
Notable Units
Units 319008 and 319009 are famous for two reasons:
On 10 December 1993 they travelled through the Channel Tunnel to Calais-Frthun and back with a party of invited guests, after the construction consortium TransManche Link (who were responsible for the construction of the Tunnel) had transferred responsibility for operations and management over to Eurotunnel. Their pantographs were modified at Chart Leacon depot in Ashford beforehand. For the subsequent “Folkestone 1994″ event, which saw the first paying members of the public taken into the tunnel by train, units 319008 and 319009 were named “Cheriton” and “Coquelles” respectively, and plaques adorned with the Union Flag and Tricolor were installed on their motor carriages.
In 1994 they set a record for the shortest London to Brighton journey time, at 37 minutes 54 seconds. This was improved upon in 2005, with the Speed Run event by Southern, using its Class 377 units 377472 and 377474. The new record is 36 minutes 56 seconds.
Both units have been denamed since being transferred from Southern to First Capital Connect.
Gallery
Southern liveried Class 319/0 No. 319011 at London St. Pancras, working a First Capital Connect service, bound for Brighton.
The original mid 80s Network SouthEast interior aboard a Class 319/0.
First Capital Connect refreshed Class 319/0 No. 319003 departs London St. Pancras, with a service bound for Bedford.
The refreshed interior aboard a First Capital Connect Class 319/0.
A refurbished Southern Class 319/2 No. 319217 at London St. Pancras, working a First Capital Connect service, bound for Brighton.
The refurbished First Class cabin aboard a Southern Class 319/2 EMU.
The refurbished Standard Class accommodation aboard a Southern Class 319/2 EMU.
A refurbished Southern Class 319/2 No. 319219 at Bedford, working a First Capital Connect service, bound for Brighton.
First Capital Connect refreshed Class 319/4 EMU No. 319428 at London St. Pancras, with a service bound for Brighton.
The refreshed interior of a First Class cabin aboard a First Capital Connect Class 319/4 EMU.
The refreshed interior of Standard Class accommodation aboard a First Capital Connect Class 319/4 EMU.
First Capital Connect refreshed Class 319/4 EMU No. 319456 at London St. Pancras, with a service bound for Brighton.
One of the pair of hameslink Programme advertising liveried Class 319/3 EMUs, No. 319364 ransforming Blackfriars at St. Albans City, with a service bound for the Streatham – Sutton/Wimbledon loop.
The other Class 319/3 EMU in the hameslink Programme advertising livery is 319365 ransforming Farringdon and is seen at London St. Pancras.
Fleet details
Class
Operator
No. Built
Year Built
Cars per Set
Unit nos.
Notes
Class 319/0
First Capital Connect
13
1987-1988
4
319001 – 319013
Class 319/2
7
319214 – 319220
Rebuilt from Class 319/0 1996-1997
Originally classed as 319/0(319014 – 319020)
Class 319/3
26
1990
319361 – 319386
Rebuilt from Class 319/1 1997-1999
Originally classed as 319/1(319161 – 319186)
Class 319/4
40
1987-1988
319421 – 319460
Rebuilt from Class 319/0
Originally classed as 319/0(319021 – 319060)
References
^ Department for Transport (2007-04-04). “More trains arriving on busy rail routes”. http://www.dft.gov.uk/pgr/rail/passenger/franchises/moretrains. Retrieved 2007-07-14.
^ “Britain Transport Infrastructure – Rail Electrification” (pdf). DfT. 2009-07-22. pp. 2224. http://www.dft.gov.uk/pgr/rail/pi/rail-electrification.pdf. Retrieved 2009-08-25.
^ Class 319
^ http://www.southernelectric.org.uk/news/lbig01.html
External links
Wikimedia Commons has media related to: British Rail Class 319
Fleet changes in April 2006
List of Class 319 trains in operation
Technical descriptions of trains used by First Capital Connect
TheRailwayCentre – Class 319.
v d e
BREL Mark 3-derived family
Diesel:
Class 150 Class 154 Class 210 450 Class (NIR)
Electric:
Class 317 Class 318 Class 319 Class 320 Class 321 Class 322 Class 455 Class 456
Electric (23 m):
Class 442
v d e
British Rail electric multiple units
AC units:
300 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 (I) 316 (II) 317 318 319 320 321 322 323 325 331 332 333 334 341 342 350 357 360 365 370 371 373 375 376 377 378 379 380 381 390 395
AC units
(pre-TOPS):
AM1 AM2 AM3 AM4 AM5 AM6 AM7 AM8 AM9 AM10 AM11 CP CW MR Lancaster Units SL
DC units:
401 402 403 404 405 410 411 412 413 414 415 416 418 419 420 421 422 423 424 427 430 431 432 438 442 444 445 446 447 450 455 456 457 458 460 465 466 471 480 482 (I) 482 (II) 483 485 486 487 488 489 499 501 502 503 504 505 506 507 508 510
DC units
(Original TOPS):
411 412 413 414 421 422 423 424 431 432 441 442 451 452 453 461 462 491 492
DC units
(pre-TOPS):
BEMU LNER Tyneside Units LNWR Watford Units LYR Bury Units
Southern Railway
designations:
2 Bil 2 EPB 2 Hal 2 Hap 2 Nol 2 Pan 2 Pep 2 Sap 2 SL 2 Wim 3 Cep 3 Cig 3 Cop 3 Sub 3 TC 3 Tis 4 Bep 4 Big 4 Buf 4 Cap 4 Cep 4 Cig 4 Com 4 Cor 4 DD 4 Des 4 EPB 4 Gri 4 Jop 4 Lav 4 Pep 4 Rep 4 Res 4 Sub 4 TC 4 Tep 4 Vec 4 Veg 4 Vep 4 Vip 4 Vop 5 Bel 5 Des 5 TCB 5 Wes 6 Cit 6 Pan 6 Pul 6 Rep 8 Dig 8 Gat 8 Mig 8 Vab GLV MLV TLV
Families:
1959 design 1972 design Mark 2-derived Mark 3-derived A-Train Desiro Electrostar Juniper Networker
Diesel locomotives Electric locomotives Miscellaneous locomotives Diesel multiple units Electric multiple units Departmental multiple units
Categories: British Rail electric multiple units | BREL productsHidden categories: Unusual parameters of Infobox train template
Tags: Ambr, Bed Pan, Bedford Luton, Body Shape, British, British Rail, Class, Class 317, Dual Voltage, Electrification, Faiveley, Farringdon, Loading Gauge, London St Pancras, Midland Main Line, Network Southeast, North South Direction, Overhead Wires, Pan Service, Pantograph, Rail, Traction Motors, Voltage Units